Skip to main content

Our approach to rebuilding and renovation

The limitations of the location are already taken into account during engineering. If necessary, measurements from the existing situation are transferred to the model. Close consultation between our BIM engineer, project manager and client during the design phase ensures that any difficulties are resolved at an early stage. The project leader provides a solid assembly plan where safety is always the starting point. During assembly, good cooperation between our skilled fitters and contractor is very important.That is why the point of contact remains the same throughout the project.

Some of our rebuilding projects 

...
Rebuilding
Winkelcentrum De Koperwiek

In deze derde fase wordt er circa 2.500 m² nieuwe winkelruimte bijgebouwd en wordt er een gedeelte van het bestaande winkelcentrum verbouwt.

Read more
...
Rebuilding
Uitbreiding Minivalve

10 jaar na de oplevering van de nieuwbouw van Minivalve heeft Novicon een nieuwe opdracht gekregen. Ditmaal ter uitbreiding van de achtergevel.

Read more
...
Rebuilding
Grolsch Maisinname

In opdracht van Grolsch realiseert Novicon een staalconstructie en de panelen rondom de silo's. Een mooie uitdaging omdat het in de hal gemonteerd moet worden waarbij weinig ruimte is.

Read more

View our other services

Supply

Read more

Roof and cladding

Read more