Skip to main content

What have we done?

This steel maintenance bridge was closed off with tents so that the maintenance work on the existing pipe bridge could be carried out and the traffic on the A76 could continue. The installation of the steel maintenance bridge took place in sections and was carried out in night sessions from 7.00 PM to 9.00 AM. Traffic on the A76 was diverted during this time.

The steel structure, weighing over 70 tonnes, was placed over the "northern" part of the existing pipe bridge. Large-scale equipment was used to carry out this work. With six trucks loaded with steel, two 140-ton telescopic cranes, one telescopic handler and three telescopic platforms, we drove from Twente to the A76 at Geleen, where the work was carried out by two assembly teams under the supervision of a lifting supervisor and a project supervisor.

In 9 weeks time, maintenance work was carried out on the existing pipe bridge, after which the steel emergency bridge was dismantled overnight. In the same night we, Novicon, mounted 82 metres of new gangways to the existing pipe bridge. A weekend later, the steel emergency bridge was assembled at night on the south side, after which the maintenance work on the existing pipe bridge took place. After the maintenance work, we dismantled and removed the emergency steel bridge at night.

See here how it was done:

Impression

We stand for

Craftsmanship

We stand for

a personal and involved approach with short lines

We have

VCA- P certified specialist people with attention to detail

We offer

an integral approach from one party

We stand for

safety and quality

We stand for

open and reliable partnership

View more projects

...
Roof and facade cladding
LNG Terminal GATE op de Maasvlakte bouwt een 4e LNG Tank

Novicon levert een belangrijke bijdrage aan de uitbreiding van GATE Terminal op de Maasvlakte. Wij leveren al het benodigde staalwerk en zijn verantwoordelijk voor de montage. Daarnaast verzorgen wij de dak- en wandbeplating van het compressorgebouw, inclusief geluiddempende roostergevels.

Read more
...
Steel construction
Update Greenergy Biofuels Amsterdam

De huidige fabriek van Greenergy in Amsterdam breidt de biodieselproductie uit door een nieuwe fabriek direct tegen de bestaande aan te laten bouwen. Novicon verzorgt de staalconstructie, trappen, roostervloeren, hekwerken en supportframes, maar verzorgt tevens het plaatsen van alle equipment.

Read more
...
Steel construction
Greenergy Biofuels Amsterdam

Novicon plaatst de deacidification column bij Greenergy Biofuels Amsterdam.

Read more