Skip to main content

Part of the steel structure is a challenging truss. The truss is assembled and this went off without a hitch.

April 2022
The finishing touches are being put on the steel structure for our Octagon project in Leiden. The heavy junctions have been welded and inspected and have been taken to the painter. We are supplying the entire steel structure for this special new building project. The entire process is under our own management, from engineering to assembly.